Laundry, hotel, hospital, restaurant — talk to our team for complete system installation.
| Facility | Daily Meals/Covers | Recommended Line |
|---|---|---|
| Factory Canteen (200-500 people) | 300-700 meals/day | İnoksan turnkey + 2 parallel service + Empero set-top |
| University/Dorm (500-2,000) | 1,000-3,500 meals/day | Full İnoksan turnkey + hot/cold lines separate + tray line |
| Hospital Kitchen (300-800 beds) | 1,500-4,500 meals/day | Diet + staff + patient-service 3 separate lines + HACCP |
| Mega Plant (2,000+) | 5,000+ meals/day | Modular İnoksan + parallel cooking + RFID portion tracking + cold chain |
CE/EN certificate (machinery safety), TS EN 631 (kitchen equipment), HACCP-ready documentation, brand authorized-distributor certificate, domestic content (Industry Ministry local-cert preferred). Kleppa Teknoloji supplies İnoksan/Empero/Öztiryakiler/Silter as authorized distributor with full CE/PED documentation ready.
İnoksan dominates turnkey tenders (hotel, hospital, university — turnkey strength), Empero set-top heavy in factory canteen / smaller scale (fast + affordable), Öztiryakiler custom stainless table/configuration (special project, boutique). Most large projects use a mix — main ovens İnoksan, salamander/grill Empero, custom tables Öztiryakiler.
Survey/site (1 week) + 3D kitchen drawing + equipment list (2-3 weeks) + revisions (1-2 weeks) + tender/quote (1 week) = average 6-8 weeks design. Production/delivery 6-10 weeks, install 1-3 weeks, training 1 week. Total 14-22 weeks.
Total cooking kW × 100 m³/hr. Example: 80 kW industrial cooking line → 8,000 m³/hr fan + fire detection (FM200/water mist) + auto-suppression. Mandatory in all new industrial kitchens since 2024.
Standard 500 meals/day factory canteen: contract-to-operating kitchen 12-16 weeks. Hospital/university (2,000+ meals): 18-26 weeks. Public tenders add 4-8 weeks for tender + contract + payment terms.
Share facility type (factory/hospital/university/military), daily meal target, and brand preference — we'll deliver a turnkey project (design + equipment + install + training).